Power :
(3) Caterpillar 3512 engines w/ 1050 kw generators
SCR System :
Nov Ross Hill 1400 3 x 4 SCR house
Mast :
Pyramid 142' w/ 890,000 # capacity on 12 lines
Substructure :
Pyramid 30' box on box
KB 31' Rotary beam clearance 25'
Block Hook :
Skytop Brewster (500 ton) block
B. J. (550 ton) hook
Pumps :
(2) Gardner Denver PZ-11 (1600 hp each) triplex pumps
Each independently powered by (2) EMD 79 traction motors
Mud Pits :
(3) tank sysytem - 1528 bbl capacity w/ 155 bbl slug pit
Solid Equipment :
Brandt King Cobra triple shaker
Brandt 3-cone desander
Brandt 24-cone desilter
Vacuum degasser
(9) mud agitators
BOP's :
11" x 5,000 psi Shaffer annular
11" x 10,000 psi Shaffer double
11" x 10,000 psi Shaffer single
Accumulator :
Shaffer 7-station, 498 gallon accumulator
Choke Manifold :
10,000 psi choke manifold
Top Drive :
Varco TDS-11-SA (500 ton)
Rotary Table :
Gardner Denver (27 1/2")
Drill Pipe :
5" drill pipe
Drill Collars :
8" and 6 1/2" drill collars
"quantity subject to availability
Auxillary Equipment :
Pason EDR (base system)
Fuel tank - 17,625 gallon capacity
Water tank - (2) 540 barrel capacity each
Rig Manager and crew quarters
NOV ST-80 iron roughneck
Pilot II automatic driller
Mathey survey unit
Man rider